Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Remove forgotten job approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76515 opened Mar 19, 2026 by FilipB Loading…
Add new profile: gcp-perfscale-qe rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76513 opened Mar 19, 2026 by qiliRedHat Loading…
feat(stolostron/cluster-permission): migrate CI config from ACM to MCE approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76512 opened Mar 19, 2026 by xuezhaojun Loading…
3 tasks
[WIP]check images subcmd do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76511 opened Mar 19, 2026 by kuiwang02 Loading…
fix failure when running on private clusters
#76510 opened Mar 19, 2026 by QiaolingTang Loading…
DPTP-4733: Fix unsupported role reference kind null approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76508 opened Mar 19, 2026 by liangxia Loading…
DPTP-4733: Fix RepeatedResourceWarning for Role/ci/release-controller-developers-monitoring approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76505 opened Mar 19, 2026 by liangxia Loading…
temporary workaround for OCPBUGS-78431 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76504 opened Mar 19, 2026 by jianli-wei Loading…
[WIP] test do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76502 opened Mar 19, 2026 by huangmingxia Loading…
replace milind to yuedong for qe members rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76501 opened Mar 19, 2026 by huali9 Loading…
DPTP-4733: Fix RepeatedResourceWarning for RoleBinding/stackrox/stackrox-image-puller-binding approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76500 opened Mar 19, 2026 by liangxia Loading…
Adding finalizers logic while cleanup approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76499 opened Mar 19, 2026 by vishnuchalla Loading…
[WIP] Launch GCP debug cluster with configurable image do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#76498 opened Mar 19, 2026 by XiyunZhao Loading…
test the rosa-sts credentials
#76497 opened Mar 19, 2026 by bmeng Loading…
NO-JIRA: update kubernetes-autoscaler test configs approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76496 opened Mar 19, 2026 by elmiko Draft
SREP-4053: Register rosa-e2e cluster profile jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76494 opened Mar 18, 2026 by dustman9000 Loading…
Sippy e2e post analysis step approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76493 opened Mar 18, 2026 by stbenjam Loading…
NO-ISSUE: ci(quay): replace e2e mirror-image test with chainsaw approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76492 opened Mar 18, 2026 by jbpratt Loading…
tide: require CodeQL checks for ARO-HCP lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76488 opened Mar 18, 2026 by hlipsig Loading…
Hive: Increase timeout for azure jobs approved Indicates a PR has been approved by an approver from all required OWNERS files.
#76486 opened Mar 18, 2026 by 2uasimojo Loading…
Right-size opendatahub cluster pool: smaller workers, larger pool rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76484 opened Mar 18, 2026 by macgregor Loading…
Add branch-protection configuration for openshift-kni/ai-sandbox approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76482 opened Mar 18, 2026 by fontivan Loading…
Add Depends-On install_yamls support to kuttl CI step approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#76481 opened Mar 18, 2026 by lmiccini Loading…
Update CI for cost-onprem-chart to run IQE tests
#76478 opened Mar 18, 2026 by testetson22 Loading…
ProTip! What’s not been updated in a month: updated:<2026-02-19.